行業(yè)資訊
水穩(wěn)冷再生的施工技術(shù)要點(diǎn)
來源:http://www.cansolv.cn/ 日期:2023-05-20
使用水泥穩(wěn)定就地冷再生技術(shù)進(jìn)行道路維修的施工工藝流程首先是進(jìn)行進(jìn)行維修路段交通道路的封閉,然后進(jìn)行施工放樣確保施工按照?qǐng)D紙進(jìn)行,將原道路進(jìn)行清洗并準(zhǔn)備好需要添加的原材料,準(zhǔn)備好冷再生機(jī)組進(jìn)行破碎和拌和,將混合料進(jìn)行攤鋪碾壓,接縫和掉頭處進(jìn)行專業(yè)處理,在接受檢查監(jiān)督確認(rèn)質(zhì)量合格之后注意養(yǎng)生期間的保養(yǎng),后就可以投入使用了。下面冷再生機(jī)租賃廠家為您分析:
The construction process of using cement stabilized on-site cold recycling technology for road maintenance first involves sealing the traffic roads in the maintenance section, and then setting out the construction to ensure that the construction is carried out according to the drawings. The original road is cleaned and the raw materials that need to be added are prepared. The cold recycling unit is prepared for crushing and mixing, and the mixture is spread and compacted. The joints and turns are professionally treated, After receiving inspection and supervision to confirm that the quality is qualified, pay attention to the maintenance during the health preservation period, and then it can be put into use. Below is an analysis of the cold regeneration machine rental manufacturer for you:
(一)施工前的準(zhǔn)備工作
(1) Preparation before construction
水泥穩(wěn)定就地冷再生技術(shù)進(jìn)行施工前,需要許多的準(zhǔn)備工作才能進(jìn)行正式施工。準(zhǔn)備工作完成的好壞,決定了之后施工結(jié)果的質(zhì)量好壞。
Before the construction of cement stabilized in-situ cold regeneration technology, a lot of preparation work is required to proceed with formal construction. The quality of the preparation work determines the quality of the subsequent construction results.
(二)再生材料配置過程
(2) Recycled material configuration process
在實(shí)際現(xiàn)場施工時(shí),我們會(huì)發(fā)現(xiàn)破舊路面的水泥穩(wěn)定碎石基層強(qiáng)度仍然很高,對(duì)于冷拌再生機(jī)來說進(jìn)行一遍的破碎工作所得到的顆粒是不達(dá)標(biāo)準(zhǔn)的,因此我們按照兩次進(jìn)行施工。
In actual on-site construction, we will find that the strength of the cement stabilized crushed stone base on the dilapidated road surface is still very high, and for the cold mix recycling machine, the particles obtained from one crushing operation do not meet the standard. Therefore, we will carry out construction twice.
(三)混合料的攤鋪和碾壓
(3) Spreading and Rolling of Mixtures
進(jìn)行水泥穩(wěn)定就地冷再生技術(shù)公路維修施工過程中,我們不需要租賃使用材料搬運(yùn)運(yùn)輸車。因?yàn)樵谏牧鲜蔷偷厝〉玫?,可以直接用來攤鋪,不需要走運(yùn)輸這一過程,也避免了運(yùn)輸過程中可能出現(xiàn)的離析現(xiàn)象,同時(shí)節(jié)省了大量資金和人力。
We do not need to rent and use material handling and transportation vehicles during the construction process of cement stabilized on-site cold recycling technology road maintenance. Because raw materials are obtained on-site and can be directly used for paving, there is no need for transportation, which also avoids possible segregation during transportation and saves a lot of money and manpower.
(四)路面養(yǎng)生和監(jiān)督檢查
(4) Road maintenance and supervision inspection
路面養(yǎng)生就是指水泥凝結(jié)期間不能有重物壓過,在養(yǎng)生期間(一般為一周以上時(shí)間)保持路面一定濕度,可以是用塑料薄膜也可以使用淋濕的桔桿麻布等等工具保持路面潮濕。同時(shí)要注意嚴(yán)禁車輛在養(yǎng)生期間破壞路面,只允許灑水車定期噴灑水分保持路面潮濕。
Road surface maintenance refers to the process of preventing heavy objects from being pressed over during the cement setting period. During the maintenance period (usually more than a week), the road surface should be kept moist, which can be achieved by using plastic film or wet tools such as orange sticks and hemp cloth. At the same time, it is important to note that vehicles are strictly prohibited from damaging the road surface during the curing period, and only sprinklers are allowed to regularly spray water to keep the road surface moist.
對(duì)水泥穩(wěn)定碎石基層冷再生底基層監(jiān)督檢查不僅僅要符合普通公路建設(shè)質(zhì)量評(píng)定標(biāo)準(zhǔn)來進(jìn)行評(píng)定,還需要對(duì)路面的冷再生材料進(jìn)行符合公路再生技術(shù)規(guī)范的質(zhì)量檢查,確定其施工路段的壓實(shí)度、平整度、抗壓強(qiáng)度都符合相關(guān)要求才能正式投入使用。更多相關(guān)事項(xiàng)就來我們網(wǎng)站http://www.cansolv.cn咨詢了解吧!
The supervision and inspection of cement stabilized crushed stone base cold recycled subbase not only needs to comply with the quality evaluation standards of ordinary highway construction, but also needs to conduct quality inspections of the cold recycled materials on the road surface that comply with the technical specifications for highway recycling, and ensure that the compaction, flatness, and compressive strength of the construction section meet the relevant requirements before they can be officially put into use. For more related matters, come to our website http://www.cansolv.cn Consult and understand!