歡迎訪問(wèn)山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車(chē)出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 行業(yè)資訊
行業(yè)資訊

粉料撒布車(chē)怎么制作過(guò)程技術(shù)
來(lái)源:http://www.cansolv.cn/ 日期:2022-12-02
一種具有出料可控功能的水泥撒布車(chē),,包括車(chē)體1,所述車(chē)體1的頂部外壁放置有料倉(cāng)10,料倉(cāng)10的一側(cè)外壁通過(guò)螺栓固定有控制模塊6,控制模塊6內(nèi)部設(shè)有速度傳感器和顯示屏,速度傳感器的型號(hào)為djs-11,速度傳感器通過(guò)can總線連接車(chē)體1的車(chē)輛控制系統(tǒng),料倉(cāng)10的一側(cè)外壁通過(guò)螺栓固定有報(bào)警器14,報(bào)警器14的開(kāi)關(guān)控制端與控制模塊6電性連接,在控制模塊6內(nèi)提前輸入需要撒布物料的體積密度或者質(zhì)量密度參數(shù),工作過(guò)程中,速度傳感器對(duì)車(chē)體1的行駛速度進(jìn)行實(shí)時(shí)檢測(cè),并傳遞信號(hào)給控制模塊6,當(dāng)車(chē)速高于或低于設(shè)定值時(shí),控制模塊6電性連接控制報(bào)警器14發(fā)出警報(bào),對(duì)人們進(jìn)行預(yù)警,控制模塊6進(jìn)行數(shù)據(jù)分析并傳輸數(shù)據(jù)給顯示屏,便于人們實(shí)時(shí)查看。
A cement spreader with controllable discharging function, comprising a vehicle body 1, wherein a bin 10 is placed on the top outer wall of the vehicle body 1, a control module 6 is fixed on one side of the outer wall of the bin 10 through bolts, a speed sensor and a display screen are set inside the control module 6, the model number of the speed sensor is djs-11, the speed sensor is connected to the vehicle control system of the vehicle body 1 through the can bus, and an alarm 14 is fixed on one side of the outer wall of the bin 10 through bolts, The switch control end of the alarm 14 is electrically connected with the control module 6. The volume density or mass density parameters of the materials to be spread are input in advance in the control module 6. During the working process, the speed sensor detects the running speed of the vehicle body 1 in real time and transmits the signal to the control module 6. When the vehicle speed is higher or lower than the set value, the control module 6 electrically connects the control alarm 14 to give an alarm to warn people, The control module 6 analyzes the data and transmits the data to the display screen for real-time viewing.
粉料撒布車(chē)
Powder spreader
為了對(duì)需鋪設(shè)的路面進(jìn)行碾壓;,所述車(chē)體1的底部外壁通過(guò)螺栓固定有固定座2,固定座2的兩側(cè)內(nèi)壁通過(guò)轉(zhuǎn)軸轉(zhuǎn)動(dòng)連接兩個(gè)滾筒4,車(chē)體1的一側(cè)外壁通過(guò)螺栓固定有出料箱8,料倉(cāng)10的底部外壁通過(guò)螺栓固定有一電動(dòng)伸縮板9,一電動(dòng)伸縮板9的開(kāi)關(guān)控制端與控制模塊6電性連接,車(chē)輛行駛過(guò)程中,兩個(gè)滾筒4隨著車(chē)輛前進(jìn)在固定座2內(nèi)轉(zhuǎn)動(dòng),對(duì)需鋪設(shè)的路面進(jìn)行碾壓,控制模塊6電性連接控制一電動(dòng)伸縮板9的開(kāi)關(guān),使得物料通過(guò)出料箱8進(jìn)行出料,便于撒布作業(yè)。
To roll the pavement to be paved;, The outer wall at the bottom of the car body 1 is fixed with a fixing seat 2 through bolts, the inner walls at both sides of the fixing seat 2 are connected with two rollers 4 through rotating shafts, the outer wall at one side of the car body 1 is fixed with a discharge box 8 through bolts, the outer wall at the bottom of the silo 10 is fixed with an electric expansion plate 9 through bolts, the switch control end of an electric expansion plate 9 is electrically connected with the control module 6, and the two rollers 4 rotate in the fixing seat 2 with the vehicle moving forward during the vehicle driving process, The road surface to be paved shall be rolled, and the control module 6 electrically connects and controls the switch of an electric expansion plate 9, so that the materials can be discharged through the discharge box 8, which is convenient for spreading.
為了避免加料過(guò)程中粉塵飛揚(yáng);,所述料倉(cāng)10的頂部外壁通過(guò)螺栓固定有粉料箱13,粉料箱13的頂部外壁通過(guò)螺栓固定有固定板,固定板的一側(cè)外壁通過(guò)螺栓固定有彈簧12,粉料箱13的兩側(cè)內(nèi)壁通過(guò)螺栓固定有轉(zhuǎn)動(dòng)軸,轉(zhuǎn)動(dòng)軸的圓周外壁套接有擋板19,彈簧12的另一端通過(guò)螺栓與擋板19的頂部外壁相連接,向粉料箱13內(nèi)添加粉料時(shí),粉料下沉在擋板19上,彈簧12彈性變形拉伸,擋板19的一端受力下滑,擋板19通過(guò)轉(zhuǎn)動(dòng)軸使得粉料箱13打開(kāi)一定角度進(jìn)行加料,添加粉料完畢后,彈簧12收縮,使得擋板19一端向上回位,從而對(duì)粉料箱13進(jìn)行閉合,避免加料過(guò)程中,粉塵飛揚(yáng)引起大氣污染。
To avoid flying dust during feeding;, The top outer wall of the bin 10 is fixed with a powder box 13 by bolts, the top outer wall of the powder box 13 is fixed with a fixing plate by bolts, one side of the outer wall of the fixing plate is fixed with a spring 12 by bolts, the inner walls on both sides of the powder box 13 are fixed with a rotating shaft by bolts, the outer wall of the circumference of the rotating shaft is sleeved with a baffle 19, and the other end of the spring 12 is connected with the top outer wall of the baffle 19 by bolts. When powder is added to the powder box 13, The powder sinks on the baffle 19, the spring 12 is elastically deformed and stretched, and one end of the baffle 19 slides under the force. The baffle 19 makes the powder bin 13 open at a certain angle for feeding through the rotation axis. After the powder is added, the spring 12 shrinks, making one end of the baffle 19 return upward, thus closing the powder bin 13, so as to avoid air pollution caused by flying dust during the feeding process.
為了便于控制粉料的輸入量;所述粉料箱13的一側(cè)外壁開(kāi)設(shè)有安裝槽,料倉(cāng)10的頂部外壁通過(guò)螺栓固定有二電動(dòng)伸縮板11,二電動(dòng)伸縮板11的開(kāi)關(guān)控制端與控制模塊6電性連接,二電動(dòng)伸縮板11的一端與安裝槽相匹配,且二電動(dòng)伸縮板11的頂部外壁通過(guò)螺栓固定有稱(chēng)重傳感器18,稱(chēng)重傳感器18的型號(hào)為pts124-133g,稱(chēng)重傳感器18的信號(hào)輸出端與控制模塊6電性連接,向粉料箱13內(nèi)添加粉料過(guò)程中,稱(chēng)重傳感器18實(shí)時(shí)檢測(cè)二電動(dòng)伸縮板11上的重量變化,當(dāng)達(dá)到設(shè)定值時(shí),傳遞信號(hào)給控制模塊6,控制模塊6電性連接控制二電動(dòng)伸縮板11開(kāi)關(guān),使得粉料箱13內(nèi)的物料下滑至料倉(cāng)10內(nèi),嚴(yán)格控制粉料的輸入量,確保后期的水泥質(zhì)量。
In order to control the input amount of powder; One side of the outer wall of the powder bin 13 is provided with an installation slot, the top outer wall of the bin 10 is fixed with two electric expansion plates 11 through bolts, the switch control end of the two electric expansion plates 11 is electrically connected with the control module 6, one end of the two electric expansion plates 11 is matched with the installation slot, and the top outer wall of the two electric expansion plates 11 is fixed with a weighing sensor 18 through bolts, and the model of the weighing sensor 18 is pts124-133g, The signal output end of the weighing sensor 18 is electrically connected with the control module 6. During the process of adding powder to the powder bin 13, the weighing sensor 18 detects the weight change on the two electric expansion plates 11 in real time. When the set value is reached, the signal is transmitted to the control module 6. The control module 6 is electrically connected to control the switch of the two electric expansion plates 11, so that the materials in the powder bin 13 slide into the bin 10, and the input amount of powder is strictly controlled, Ensure the cement quality in the later period.
為了便于向料倉(cāng)10內(nèi)添加水;所述料倉(cāng)10的頂部外壁通過(guò)螺栓固定有水箱15,水箱15的圓周外壁通過(guò)螺栓固定有輸水管,輸水管的圓周外壁通過(guò)螺栓固定有電動(dòng)閥門(mén)22,電動(dòng)閥門(mén)22的開(kāi)關(guān)控制端與控制模塊6電性連接,料倉(cāng)10的一側(cè)外壁通過(guò)螺栓固定有透視窗5,透視窗5的一側(cè)外壁粘接有刻度線,打開(kāi)電動(dòng)閥門(mén)22,水箱15通過(guò)輸水管向料倉(cāng)10內(nèi)添加水,期間,通過(guò)透視窗5可以清晰了解水箱10內(nèi)的物料使用情況。
To facilitate the addition of water to bin 10; The top outer wall of the silo 10 is fixed with the water tank 15 by bolts, the peripheral outer wall of the water tank 15 is fixed with a water delivery pipe by bolts, the peripheral outer wall of the water delivery pipe is fixed with an electric valve 22 by bolts, the switch control end of the electric valve 22 is electrically connected with the control module 6, one side of the outer wall of the silo 10 is fixed with a perspective window 5 by bolts, one side of the outer wall of the perspective window 5 is bonded with a scale line, and the electric valve 22 is opened, The water tank 15 adds water to the silo 10 through the water delivery pipe. During this period, the use of materials in the water tank 10 can be clearly understood through the perspective window 5.
為了控制水的輸入量;所述料倉(cāng)10分為上料倉(cāng)10和下料倉(cāng)10,上料倉(cāng)10和下料倉(cāng)10之間通過(guò)螺栓固定有隔板,上料倉(cāng)10的一側(cè)內(nèi)壁通過(guò)螺栓固定有液位傳感器23,液位傳感器23的型號(hào)為lk1022,液位傳感器23的信號(hào)輸出端與控制模塊6電性連接,水箱15通過(guò)輸水管向上料倉(cāng)10內(nèi)添加水時(shí),液位傳感器23實(shí)時(shí)檢測(cè)上料倉(cāng)10內(nèi)的液位變化,當(dāng)水位達(dá)到設(shè)定值時(shí),傳遞信號(hào)給控制模塊6,控制模塊6電性連接控制電動(dòng)閥門(mén)22的開(kāi)關(guān),嚴(yán)格控制水的輸入量,進(jìn)一步確保水泥的質(zhì)量。
To control the water input; The bin 10 is divided into an upper bin 10 and a lower bin 10. A partition is fixed between the upper bin 10 and the lower bin 10 through bolts. A liquid level sensor 23 is fixed on one side of the inner wall of the upper bin 10 through bolts. The model of the liquid level sensor 23 is lk1022. The signal output end of the liquid level sensor 23 is electrically connected with the control module 6. When the water tank 15 adds water to the upper bin 10 through the water pipe, the liquid level sensor 23 detects the change of the liquid level in the upper bin 10 in real time, When the water level reaches the set value, the signal is transmitted to the control module 6, which is electrically connected to control the opening and closing of the electric valve 22 to strictly control the water input to further ensure the quality of cement.
為了便于制備水泥,所述料倉(cāng)10的一側(cè)外壁通過(guò)螺栓固定有兩個(gè)支撐座,兩個(gè)支撐座的頂部外壁分別通過(guò)螺栓固定三電機(jī)16和四電機(jī)17,上料倉(cāng)10的兩側(cè)內(nèi)壁通過(guò)轉(zhuǎn)軸轉(zhuǎn)動(dòng)連接有兩個(gè)螺旋輥21,兩個(gè)螺旋輥21的輸入端通過(guò)聯(lián)軸器分別與三電機(jī)16的輸出端和四電機(jī)17的輸出端相連接,分別啟動(dòng)三電機(jī)16和四電機(jī)17開(kāi)關(guān),帶動(dòng)兩個(gè)螺旋輥21進(jìn)行旋轉(zhuǎn)作業(yè),對(duì)上料倉(cāng)10內(nèi)的粉料與水進(jìn)行攪拌作業(yè),制備成水泥。
In order to facilitate the preparation of cement, two support seats are fixed on one side of the outer wall of the silo 10 through bolts, the top outer walls of the two support seats are respectively fixed with three motors 16 and four motors 17 through bolts, the inner walls on both sides of the feeding silo 10 are connected with two spiral rolls 21 through rotating shafts, and the input ends of the two spiral rolls 21 are respectively connected with the output ends of three motors 16 and four motors 17 through couplings, Start the three motor 16 and four motor 17 switches respectively to drive the two spiral rollers 21 to rotate, and mix the powder and water in the feeding silo 10 to prepare cement.
水泥灑布機(jī)出租
Rental of cement distributor
述隔板的頂部外壁開(kāi)設(shè)有下料槽20,隔板的底部外壁通過(guò)螺栓固定有三電動(dòng)伸縮板26,三電動(dòng)伸縮板26的開(kāi)關(guān)控制端與控制模塊6電性連接,水泥制備完畢后,控制模塊6電性連接控制三電動(dòng)伸縮板26的開(kāi)關(guān),使得上料倉(cāng)10的水泥隨著螺旋輥21的旋轉(zhuǎn)向下料槽20處輸送,下落至下料倉(cāng)10內(nèi)部。
The top outer wall of the diaphragm is provided with a blanking tank 20, and the bottom outer wall of the diaphragm is fixed with three electric expansion plates 26 through bolts. The switch control end of the three electric expansion plates 26 is electrically connected with the control module 6. After the cement preparation is completed, the control module 6 electrically connects and controls the switch of the three electric expansion plates 26, so that the cement in the feeding bin 10 is transported to the feeding tank 20 along with the rotation of the spiral roller 21 and falls into the inner part of the unloading bin 10.
為了輸送物料進(jìn)行處料;所述下料倉(cāng)10的兩側(cè)內(nèi)壁均通過(guò)轉(zhuǎn)軸轉(zhuǎn)動(dòng)連接有兩個(gè)轉(zhuǎn)動(dòng)輥,兩個(gè)轉(zhuǎn)動(dòng)輥的圓周外壁套接有同一個(gè)輸送帶25,輸送帶25的底部面與下料倉(cāng)10的頂部面留有3cm的間隙,料倉(cāng)10的一側(cè)外壁通過(guò)螺栓固定有一支撐板,一支撐板的頂部外壁通過(guò)螺栓固定有一電機(jī)3,一電機(jī)3的開(kāi)關(guān)控制端與控制模塊6電性連接,且一電機(jī)3的輸出端通過(guò)連接軸與其中一個(gè)轉(zhuǎn)動(dòng)輥的輸入端相連接,控制模塊6電性連接控制一電機(jī)3工作,帶動(dòng)轉(zhuǎn)動(dòng)輥進(jìn)行旋轉(zhuǎn),從而使得輸送帶25進(jìn)行輸送物料作業(yè)。
Handling for conveying materials; The inner walls on both sides of the blanking bin 10 are rotationally connected with two rotating rollers through a rotating shaft. The outer walls of the circumference of the two rotating rollers are sleeved with the same conveyor belt 25. A gap of 3cm is left between the bottom surface of the conveyor belt 25 and the top surface of the blanking bin 10. One side of the outer wall of the bin 10 is fixed with a support plate through bolts. The top outer wall of a support plate is fixed with a motor 3 through bolts. The switch control end of the motor 3 is electrically connected with the control module 6, The output end of a motor 3 is connected with the input end of one of the rotating rollers through a connecting shaft. The control module 6 electrically controls the operation of a motor 3 to drive the rotating rollers to rotate, so that the conveyor belt 25 can transport materials.
以上就是為大家介紹的有關(guān)冷再生機(jī)租賃的詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問(wèn)的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://www.cansolv.cn
The above is a detailed introduction to the rental of the cold regenerator. I hope it will be helpful to you. If you have any questions, please contact us. We will provide services for you with our attitude http://www.cansolv.cn
  • 上一條:冷再生機(jī)的整形及碾壓
  • 下一條:冷再生機(jī)的正確的操作方法,快看看你操作對(duì)了嗎
  • 相關(guān)新聞: