歡迎訪問山東途暢路橋工程有限公司網站!

冷再生機租賃,水泥撒布車出租

施工租賃熱線

18264104888

您現在所在的位置 :首頁 - 新聞中心 > 公司新聞
公司新聞

冷再生機租賃對瀝青路面改造的配置要求?
來源:http://www.cansolv.cn/ 日期:2020-10-14
  十幾年前在道路施工時,需要將舊的瀝青路面鏟除,造成了很大的浪費,而現在冷再生機出現 ,可以減少浪費。冷再生機是指瀝青路面就地冷再生是利用一體化的再生設備、添加材料、一 次拌和成型工藝,通過新鋪結構面層,構成舊路面改造新的一套完整體系。下面冷再生機租賃廠家就來講解一下關于對瀝青路面改造的配置要求和準備工作。
  More than ten years ago, in the road construction, the old asphalt pavement needs to be removed, resulting in a lot of waste, but now the emergence of cold recycling machine, can reduce waste. Cold recycling machine refers to the cold in place recycling of asphalt pavement, which is a complete set of new system of old pavement reconstruction by using the integrated recycling equipment, adding materials and one-time mixing molding process through the new pavement structure. The following cold recycling machine rental manufacturers will explain the configuration requirements and preparations for asphalt pavement reconstruction.
  準備工作:
  preparation:
  再生前的各項準備工作在施工前到位,確保工期正常進行。主要內容包括:人員準備、機 械準備、材料準備、交通協調及后勤保障。
  All preparations before regeneration shall be in place before construction to ensure normal construction period. The main contents include: Personnel Preparation, mechanical preparation, material preparation, traffic coordination and logistics support.
                    冷再生機租賃
  材料要求:
  Material requirements:
  水泥選用強度等級為32.5、初凝時間≥3h、終凝時間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥 。水泥應具有良好的工作性、低水化、高后期強度、耐久性、耐腐蝕性和抗裂性能。
  Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h. Cement should have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
  機械要求:
  Mechanical requirements:
  工程施工過程通過再生機組來完成,再生機組包括:冷再生主機、水泥稀漿車、平地機、 壓路機等。
  The construction process of the project is completed by regeneration unit, which includes: Cold Recycling host, cement slurry truck, grader, roller, etc.
  人員要求:
  Personnel requirements:
  工程技術人員及機械操作人員應經過冷再生培訓并經過考核合格后方可上崗。
  Engineering and technical personnel and mechanical operators shall receive cold regeneration training and pass the examination before taking up their posts.
  工程協調:
  Project coordination:
  作好施工總體計劃,采取不中斷交通半幅施工,作好施工期間交通疏導工作,準備施工作 業面的遮擋。
  The overall construction plan shall be made, the half width construction without interruption of traffic shall be adopted, the traffic dredging work during the construction period shall be well done, and the shelter of the construction working surface shall be prepared.
  以上是關于冷再生機對瀝青路面改造的配置要求的介紹,相信大家都有所了解了,如想了解更多內容歡迎點擊我們的http://www.cansolv.cn網站。
  The above is about the configuration requirements of cold recycling machine for asphalt pavement reconstruction. I believe you all know something about it. If you want to know more, please click our http://www.cansolv.cn Website.
  • 上一條:水泥撒布車的使用率如何提高?
  • 下一條:冷再生泡沫瀝青冷再生機出租施工的技術有哪些?
  • 相關產品: